700 CM Sheikhupura-Faisalabad Roadbeing operated by Revgreen Pakistan till date

This plant was installed in spinning mills located at Feroze Watoowan in 2012. This was a pilot project with aim to produce biogas for electricity production. The feedstock was procured from different sources locally.

The core of the plant was a 700 cubic meter digester that was concrete super the plant and was fed on daily basis to get maximum yield from the plant. The raw gas was collected in floating drum fabricated out of G.I Steel sheet. The drum was coated with hot bitumen for rust proofing.

Revgreen Pakistan operated this plant for 6 months and operated a 75 KVA generator for 12 hours daily.

Plant Features:

  • Plant Capacity: 700 Cubic Meters
  • No of Digesters: 1 X 700 Cubic Meter
  • Feedstock: Cow Dung, Grass, Vegetable waste etc.
  • Biogas Yield: 500 Meter Cube/Day
  • Biogas Purification: 2 Water Scrubbing Columns
  • Utilization: 75 KVA Gas Generator
how can we help you?

Contact us at the Consulting WP office nearest to you or submit a business inquiry online.

Working with Revgreen Team is a great experience! The team is very professional and knows their job well. Well Done Team Revgreen

placeholder
Mr. Faisal Yasin
, Greenland Dairy Farms, Islamabad

looking for a biogas plant consultant?